**Product Specifications:**
- **Model No.:** J17112512
- **Runner:** Hot Runner
- **Design Software:** UG
- **Installation:** Fixed
- **Certification:** ISO
- **Standard:** DME
- **Customized:** Yes, Customized
- **Size:** According to Customer’s Requirements
- **Mould Quality Control:** In-house Professional QC
- **Mould Runner System:** Hot or Cold Runner System
- **Mould Standard:** DME, HASCO, LKM, etc.
- **Mould Design Software:** UG, ProE, SolidWorks CAD, Etc.
- **Mould Cooling System:** Designed by Experienced Engineers
- **Mould Base:** S50C
- **Heat Treatment:** Nitriding
- **Design Time:** 7 Days
- **Trademark:** JSLMOULD
- **Transport Package:** High-Quality Wooden Case
- **Specification:** DME, HASCO, LKM, etc.
- **Origin:** Huangyan, Taizhou, China
- **HS Code:** 848071909
---
**JSL Mould Quality Control**
At JSL Mould, we ensure the highest quality standards through a three-step process:
1. **Material Quality Control**
- Mould steel is checked for hardness and flaw detection.
- Standard spare parts are inspected for hardness, size, and quality.
2. **Mould Making Process Quality Control**
- Design checks are conducted on part design, mould design, and engineering drawings.
- Each component is measured after machining according to 2D drawings.
- The entire mould is tested for proper running condition.
3. **Final Check Before Shipment**
- We review all specifications again to ensure they meet customer requirements before shipping.
---
**Product Details:**
| Product Name | Motorcycle Headlight Front Visor Plastic Mold |
|--------------------------|------------------------------------------------|
| Product Material | ABS |
| Core & Cavity Steel | 718 |
| Steel Hardness | HRC 34–38 |
| Mould Standard | DME, HASCO, LKM, etc. |
| Cavity Number | 1 |
| Injection System | Side Gate |
| Ejector System | Lifter |
| Mould Base | S50C |
| Cycle Time | 40 Seconds |
| Tooling Lead Time | 60 Days |
| Mould Life | 1,000,000 Shots |
| Quality Assurance | ISO 9001 |
| Specification | As per Client’s Requirements |
---
**Our Advantages:**
1. High-quality molds
2. Competitive pricing
3. On-time delivery
4. Excellent after-sales service
5. Strict quality control
6. All molds are automatic
---
**What We Offer You:**
- Prompt response to emails, calls, or faxes
- Quick quotation and mold design
- Timely communication on technical details
- Regular updates with pictures of mold progress and schedule
- Fast mold testing and sample delivery
- Timely mold delivery
---
**Process Overview:**
1. Receive samples, drawings, and requirements from you
2. Mould design: We will discuss and exchange opinions after your order
3. Material procurement: Steel cutting and base tooling
4. Assembly
5. Inspection during the tooling process
6. Mould testing: We will notify you of the date and send a report along with injection parameters
7. Your confirmation for shipment
8. Final check before packing
---
**FAQ:**
**Q1: How about your quality control?**
A: We have a professional QC team that ensures quality from raw material to final product. Quality is our top priority.
**Q2: What's your lead time?**
A: For most molds, it takes 45–60 working days (excluding Chinese holidays) after deposit and drawing approval.
**Q3: How to approve samples?**
A: You can visit our factory to see the test in person, or we can send samples via DHL, TNT, or FedEx. We also provide video and dimensional reports.
**Q4: What about after-sales service?**
A: Non-man-made damaged spare parts are provided free of charge within one year. Feel free to contact us anytime.
---
**Images of the Mold:**
[Image 1]
[Image 2]
[Image 3]
[Image 4]
[Image 5]
[Image 6]
---
For more information or to place an order, feel free to contact us. We look forward to serving you!
Air Shower,Rapid Rolling Door Air Shower,Rolled Steel Air Shower,Double People Automatic Air Shower
Wuxi Zijing Purification Engineering Co., Ltd , https://www.zijingjh.com