JSL Mould Quality Control
For the quality control of the mould, there are three main steps:
1. **Mould Material Quality Control**
- Checking of mould steel (hardness, flaw detection)
- Inspection of standard spare parts (hardness, size, and flaw checking)
2. **Mould Manufacturing Process Quality Control**
- Design checking (part design, mould design, engineering drawings)
- Verification of each part's dimensions after machining according to 2D drawings
- Mould testing to ensure proper running conditions
3. **Final Check Before Shipment**
- Re-checking against customer requirements before final delivery
Product Name | Motorcycle Headlight Front Visor Plastic Mold |
Product Material | ABS |
Core & Cavity Steel | 718 |
Steel Hardness | HRC 34-38 |
Mould Standard | DME, HASCO, LKM, etc. |
Cavity Number | ONE |
Injection System | Side Gate |
Ejector System | Lifter |
Mould Base | S50C |
Cycle Time | 40 seconds |
Tooling Lead Time | 60 days |
Mould Life | 1,000,000 shots |
Quality Assurance | ISO 9001 |
Specification | According to client’s requirements |
Our Advantages | |
1. High quality | 2. Reasonable price |
3. On-time delivery | 4. Good after-sales service |
5. Strict quality control | 6. All moulld are automatic |
What We Offer | |
In-time response to emails, calls, or faxes | In-time quotation and mold design supply |
In-time communication on technical points | In-time sending of progress photos and schedule updates |
In-time mould testing and sample delivery | In-time mould delivery |
Process for Injection Motorcycle Mold | |
1. Samples/Drawing & Requirements from you | 2. Mould Design: Communication and exchange of opinions after order placement |
3. Material Purchase: Steel cutting and base tooling | 4. Assembly |
5. Mould Inspection: Monitoring during production | 6. Mould Testing: Send samples, inspection report, and injection parameters |
7. Your instruction and confirmation for shipment | 8. Final check before packing |
![]() ![]() ![]() ![]() ![]() ![]() FAQ: 1. How about your quality control? We have a professional QC team that ensures quality from raw materials, machining, to final testing. Quality is our top priority and the foundation of our business. 2. What's your lead time? Most molds take 45 to 60 working days (excluding Chinese holidays) after deposit and drawing approval. 3. How to approve samples? You can visit our factory to see the test results directly, or we can send samples via DHL, TNT, or FedEx. We also provide mold running videos and dimensional reports by email. 4. What about after-sales service? We offer free spare parts for non-man-made damage within one year. Contact us anytime if you need assistance. For more information, please contact us. |
Customized Air Shower,Customized Air Shower Room,Channel Air Shower Customized,Double Person Air Shower Room
Wuxi Zijing Purification Engineering Co., Ltd , https://www.zijingjh.com