PPR Pipe Fitting Mould/Mold (MELEE MOULD -281)

Model NO.: MELEE MOULD -281
Origin: Huangyan, Taizhou
HS Code: 8480710090
Detail description of PPR Pipe fitting Moulds/molds. Plastic Pipe Fitting Mould, Pipe Fitting Mould,
PVC Pipe Fitting Mould/mold. Plastic Fitting Mould.
Product Name: Plastic Pipe Moulds/molds.
Product material: ABS, PP, PE or as per customer requirement.
Plastic Fitting Moulds/molds cavity: As per customer requirement
Pipe Moulds/molds size: Depends on your design.
Plastic Moulds/molds material: P20, 718...
Plastic Moulds/molds life: 800k shots
Plastic Moulds/molds Runner system: Cold runner or hor runner
Plastic Moulds/molds features: Good quality
Injection cycle time: 50seconds
Tooling time: 20days

MELEE MOULD Co., Ltd service process for Plastic Moulds/molds

1. Design/sample: Product, mould, etc.

2. Discussion: Mould material, cavity number, price, runner, payment, etc.

3. Order placed: According drawing or your samples.

4. Design mould: We will send mould design to customer for confirmation

5. Mould tooling: We start to make mould after mould design confirmed

6. Mould processing: Send pictures to customer every week for the customer to know the mould processing.

7. Mould shot trial: Send mould shot trial samples to customer to confirm mould quality

8. Delivery: Ship mould after mould quality confirmed.

Hydraulic Cylinder Body, Cylinder body, Hydraulic Cylinder Component,Hydraulic Part      

Material

Iron, Steel,  Stainless steel, Aluminum alloy, etc.

Equipment

CNC Machining Center,Lathe, VMCs with 4 axis,Grinding/Milling/Tapping/Drilling Machines,drawbench, cutter .etc

Process

Casting, Forging, CNC milling and turning, drilling, grinding, bending, stamping, tapping

Surface Treatment

Polishing, Powder coating, Spraying, Anodising, Zinc Plating and etc

Tolerance

0.005mm~0.1mm

Surface Roughness

Ra0.8-3.2

Measuring & Testing

CMM, Hardness, Chemical & Mechanical, MPT, UT, Metallographic, Radiographic testing, etc

Software

Solidworks, Mastercam, Procast 

Application

Hydraulic Clinder, Automobile, etc

Package

Plastic bag, carton box, plywood crate, rust prevention

Certification

TS-16949 / ISO9001

Lead Time

45 days for sample, 60 days for mass production

Payment Terms

TT, L/C

Shipment Terms

FOB, CFR & CIF 

Cylinder Body

Cylinder Body,Steel Casting Cylinder Body,Sand Casting Machined Parts,Casting Cylinder Body Component

J.B MACHINERY (NINGBO) CO., LTD. , https://www.jbcastings.com